Completion Services


Go Search
Skip Navigation Links






COMPLETION SERVICES

Completion Services provided by TES include:

  • Engineering Services
  • Wellbore Preparation
  • Completion Equipment
  • Sand Control Services

Gravel packing was first done by Tucker Energy Services in the 1940s. Improved seal bore packers, quality sand
and new techniques were introduced in the early 1970s for wells offshore Trinidad, which have extremely fine
unconsolidated formation sands, and where sand control is known to be difficult. TES has pumping equipment
specifically designed for sand control applications, including high horsepower pumps for high-rate gravel
packing and frac packing. Economical tools and pumping equipment are also available; these are typically
used on land completions in Venezuela and Colombia.

 

2
1940S sand control pumping job
using early stream powered Unit
1
Early 1940s job using
completion service tools.

 

 

 

 


Our production tool product line, permanent and retrievable packers and flow control tools are utilized in hostile environments, including corrosive, thermal and high pressure conditions. In addition, TES  provides all of the engineering software and services required to support proper design and installation.

3
First sand control completion
packer run in Trinidad in 1940s

4

TES personnel work with
blenders on sand control job offshore Trinidad in 1977

 

 

 

 

 































 










  Copyright © 2013 Tucker Energy Services, Inc. Terms of Use               Privacy Policy