PPS - Underbalance Operations

The first Underbalance Operations using nitrogen was conducted by Tucker Energy Services Limited in the year 2011. All these jobs were performed successfully on the Rig during work over operations.

PPS5
Picture 1: Shows the Layout of the equipment for Underbalance operations on the rig in 2018.